Painting siding, fascia and soffits

Wash, scrape, prime and paint a whole house exterior with the right access for each stage.

Exterior painting, stage by stage

Each stage needs a different kind of access. Rent for each stage as you reach it.

Dry weather is the schedule driver. Book the lift for the forecast window, and remember the week rate covers 3 to 7 days, so a lift that sits through one rain day does not change the price.

Power wash the siding, fascia and soffits

Paint only sticks to clean, dry surfaces. A power washer takes off chalk, mildew and loose paint. Keep the wand moving and angled down so water does not drive up under lap siding or into soffit vents. Let the house dry for a few days before you prime. Washing is also the moment you find the rot you will have to replace before painting.

Mi-T-M 2700 PSI power washer for most siding; the 4000 PSI unit where more cleaning power is needed. 50 ft hose included, garden-hose supply.

Scrape, sand, fill and caulk

This is the slow stage and the one where access matters most. You stand in one place for a long time at fascia and soffit height. Scrape to a firm edge, sand the transitions, set popped nails, fill and caulk the gaps. On homes built before 1978 have the old paint tested for lead before you sand.

Bil-Jax scaffold tower (10 to 30 ft kits, 17 to 37 ft working height) for long sessions at one wall; 24 or 32 ft fiberglass extension ladder for spot work.

Spot prime bare wood and repairs

Prime every bare spot and every new piece of trim. On a two-story house this means you cover the whole perimeter again at height, which is where a lift that moves along the wall saves setups. Work from the top down so drips land on surfaces you have not finished yet.

Same access as stage 4. A self-propelled boom covers the perimeter without resetting; a towable boom is moved a few times per wall.

Soffits and fascia first, from a lift

Soffits are overhead work. On a boom lift you raise the basket until the soffit is at chest height and roll or brush along it. Tie off in the basket. Keep the platform load under 500 lb including people, buckets and a sprayer. Watch the boom's swing path for the service drop, tree limbs and the gutter itself.

Haulotte 4527A towable (45 ft platform, 51 ft working height, 27 ft outreach) or 45XA self-propelled for moving along the house all day. Genie Z-45 FE if a porch roof sits between you and the wall.

Siding from the ground up

Once the overhead work is done, the lower siding goes from a step ladder or the ground. Cut in around windows, doors and the trim you already painted. Paint in the shade where you can; direct sun on a hot wall sets the paint before it levels.

10 or 12 ft fiberglass step ladder; 24 ft extension ladder for the band just below the soffit.

Picking access for the high work

  • A ladder is right for a single task and wrong for a whole house. Every move is a trip down and back up, and you cannot paint more than an arm's reach either side of the rails. For quick repairs, the 24 ft fiberglass ladder handles single-story fascia; the 32 ft reaches most two-story rooflines. Set the base 1 ft out for every 4 ft up.
  • A Bil-Jax tower is right for hours of scraping and priming at one wall section. It sets on firm level ground on leveling jacks, needs guardrails before anyone climbs, and taller kits call for outriggers or tie-ins. Moving it along a wall means breaking it down.
  • A boom lift is right for the painting stages, where you move continuously along the eave. The towable 4527A sets up on outriggers on firm ground or pads and tows behind a properly rated pickup. The 45XA self-propelled drives along the building without resetting and suits long days; it needs firm, reasonably level ground and is usually delivered. Both put a 500 lb basket at a 51 ft working height. Taller homes or deeper setbacks step up to the 5533A towable or 55XA self-propelled at 61 ft 3 in working height.

When to bring in a professional

  • Call a painting contractor or a remediation firm if the test comes back positive for lead and you are not set up for containment. Call a roofer or carpenter if the fascia is rotted far enough that the gutter has pulled loose or the rafter tails are soft; that is structural work, and painting over it does nothing. Call the utility if the service drop runs within a boom's reach of the wall you are painting.

Set the site up for a lift

Walk the perimeter

Note decks, porches, AC units, window wells and planting beds that keep a lift away from the wall. Each one adds setback that the boom's outreach has to cover.

Check the ground

Towables need firm ground or pads under the outriggers. Self-propelled booms need firm, reasonably level ground to drive on. Wet lawn ruts and sinks; wait a day after heavy rain.

Find the power lines

Locate the service drop before the lift arrives. Plan the boom's path so it never swings toward it. Fiberglass ladders only near electrical.

Your project checklist

Save these details before you request equipment.

  • Height to the soffit on each side of the house
  • Obstructions between the lawn or driveway and each wall
  • Ground conditions where a lift would set up or drive
  • Age of the house and whether old paint has been tested
  • Which stages you will do yourself and on which days
  • Tow vehicle rating, or delivery address and dates

Let's match the machine to your job.

Tell us what you're working on. Our Hamburg team serves Southeast Michigan, seven days a week.

(810) 231-7368

Explore equipment for this guide

Questions before you rent

Towable or self-propelled boom for painting a house?

Both reach the same height and carry the same 500 lb. The towable sets on outriggers, so each move along the wall means lowering the boom, pulling the outriggers, hitching up and resetting. On a house with four walls and a few obstructions that is a handful of moves a day, which many customers accept for the option to tow it home. The self-propelled drives along the wall with the basket up, so you paint the whole eave in one pass. Pick it for long days, large homes or commercial buildings, and remember it needs firm, reasonably level ground and usually comes on our truck.

Can I take a paint sprayer up in the basket?

Yes, within the platform capacity. The Haulotte booms are rated for 500 lb and the Genie Z-45 FE for 660 lb, and that number includes every person, bucket, hose and tool on the platform. Keep the hose routed so it cannot snag a control or the boom. Most crews leave the pump on the ground and run the hose up. Tie off in the basket every time.

What does delivery cost for a lift?

Delivery is priced by drive time from Hamburg and confirmed at checkout, round trip on our own trucks, seven days a week. Towable booms and scissor lifts are $125 within 45 minutes of the yard; self-propelled booms are listed at $85 on their product pages. Both have a higher tier out to 75 minutes and a quote beyond. The Genie Z-45 FE is delivered only, at the telehandler tier of $350 within 45 minutes. You can also tow the towable boom yourself behind a properly rated pickup.

Should I rent for the day or the week?

Prep and painting on a whole house rarely fits one day, and the week rate covers 3 to 7 days. Rental time counts the hours the lift is out, including weekends and holidays, with no cap on run hours. If rain pushes you a day past the week, the extra is prorated and never more than the next full period. Fuel is billed at our cost. For a single-wall touch-up, the day rate is the right call.

Do I need any training to use the lift?

Lift operators need training, and boom occupants wear a harness tied off to the basket anchor. Ask us to go over the controls, outrigger setup and emergency lowering when you pick up or when we deliver, and read the manual on the machine before you leave the ground. Keep the boom clear of power lines at all times. A Bil-Jax tower needs guardrails before anyone climbs and outriggers or tie-ins on the taller kits.