
West Bloomfield, Michigan
Equipment rental in West Bloomfield, MI
The right equipment, delivered to West Bloomfield from our Hamburg yard.
Mini excavators, compact loaders, lifts and lawn equipment for West Bloomfield Township, Orchard Lake Village and Keego Harbor. Pick up at our yard on M-36 in Hamburg or request jobsite delivery.
Equipment for West Bloomfield projects
Find the machine that fits the job. Each card opens the equipment with current rates and availability.

Mini excavators
Bobcat E10, E35 and E48Trenching, drainage and footings.
View equipment →
Stand-on compact loaders
Bobcat MT100Tight access between houses and through gates.
View equipment →
Boom & scissor lifts
Articulating booms and scissor liftsExterior work and elevated access.
View equipment →
Chippers & stump grinders
6″ and 12″ chippers, tracked stump grinderBrush, limbs and stumps after clearing.
View equipment →Delivery to West Bloomfield, made simple.
Delivery and pickup is one round-trip fee based on drive time from our Hamburg yard and on what we are hauling. West Bloomfield, Orchard Lake and Keego Harbor are at the eastern edge of our coverage, so most addresses fall in our 46–75 minute tier. We confirm the tier from your jobsite address when you request equipment.
| Equipment | 1–45 minutes | 46–75 minutes |
|---|---|---|
| Truck / trailer loadsMini excavators, skid steers and most equipment | $85 | $125 |
| Scissor lifts & dual-machine loads | $125 | $200 |
| TowablesTowable booms, chippers, log splitters | $125 | $175 |
| TelehandlersIncludes the Genie Z-45 FE boom lift | $350 | $450 |
Delivery fees are separate from rental rates. Full delivery policy and every community we serve on our Service Areas page.
Built for the projects on your list.
Orchard Lake Village is about 43 percent water with large wooded estate lots and a tree-removal ordinance; Keego Harbor layers zoning permits on building permits; and most lake lots in the area sit within 500 feet of water, which triggers county soil erosion rules.
Lakefront estate lots
Shoreline work, seawall footings and drainage on lots from 15,000 to 60,000 square feet along Orchard, Cass and Upper Straits lakes. Compact tracked excavators and loaders protect the landscaping; pumps for wet digs.
Mini excavators →Tree work under a tree ordinance
Heavy canopy and a tree-removal ordinance in Orchard Lake Village. Get the approval first, then a boom lift for the limbs, a chipper for the brush and a tracked stump grinder to finish.
Chippers & stump grinders →Small in-town lots in Keego Harbor
Compact city lots where most projects need a zoning permit as well as a building permit. The MT100 and E10 fit the side yard for patios, drainage and small foundations.
Stand-on compact loaders →Exterior maintenance
Siding, soffits, gutters and windows on large two-story homes. Boom and scissor lifts sized to the working height and the ground they sit on.
Boom & scissor lifts →- Owner-operated since 2002.Andy still works the front counter.
- Local team. Real support.In-house sales, service techs and fleet manager.
- Our equipment. Our trucks.Delivered and picked up by our own crew.
- Flexible rental periods.Half-day, day, week and 4-week; no hour-meter billing.
Renting in West Bloomfield: common questions
Do you deliver to West Bloomfield, Orchard Lake and Keego Harbor?
Yes. We deliver and pick up 7 days a week from our Hamburg yard, and all three communities are inside our standard coverage. Send the jobsite address with your request and we will confirm the delivery tier and a drop-off window.
How much is delivery to my West Bloomfield jobsite?
Delivery is a round-trip fee set by drive time from Hamburg and by the load. Most addresses here fall in the 46–75 minute column of the table above: $125 for a single truck or trailer load such as a mini excavator or skid steer, with higher rates for scissor lifts, towables, two-machine loads and telehandlers. The fee is separate from the rental rate, and we confirm it from your address and equipment before anything ships.
Can I pick up equipment instead?
Yes. Our yard is at 6472 E M-36 in Hamburg (directions (opens in new tab)). Smaller equipment rides in a pickup or SUV; machines such as mini excavators and skid steers go on one of our trailers, which need a properly rated tow vehicle and the right hitch ball. Tell us what you drive and we will confirm the setup before you make the trip.
Which machine fits through a narrow gate?
Two compact options: the Bobcat E10 mini excavator is 28 inches wide with its tracks pulled in, and the Bobcat MT100 stand-on loader is under 36 inches wide. Measure your narrowest opening and check turning room, overhead clearance and the ground you will cross; a machine that clears the gate still needs room to work on the other side.
What should I check before digging or starting a property project?
Request utility marking through MISS DIG 811 (opens in new tab) before any digging, wait for the legal start date on your ticket, and hand dig near the marks. For permits, West Bloomfield Township, Orchard Lake Village and Keego Harbor each run their own Building Department. Orchard Lake asks owners to contact the city before making any property change and enforces a tree-removal ordinance; Keego Harbor requires zoning permits alongside building permits for most projects.
How do I request equipment for my dates?
Open the equipment page, choose your dates and pickup or delivery, and submit a request. Our team confirms availability and the details with you, so you are never booked blind. Prefer to talk it through? Call or text 810-231-7368.
Working in a nearby community?
View all service areas →Helpful local project resources
Official sources for the planning side of the jobs above. Each opens in a new tab.
- MISS DIG 811 ↗ (opens in new tab)Michigan’s utility-locating service. File a locate request before any trenching, post holes or stump grinding.
- West Bloomfield Township Building Division ↗ (opens in new tab)Building permits, forms and inspections for township properties.
- Orchard Lake Village Community Development ↗ (opens in new tab)Building Department and ordinances; contact the city before making changes to your property.
- City of Keego Harbor Building Services ↗ (opens in new tab)Building, trade and zoning permits with 24-hour inspection notice.
- Oakland County Water Resources Commissioner — soil erosion permits ↗ (opens in new tab)Required for earth changes over 1 acre, or over 225 square feet within 500 feet of a lake, stream or wetland, in communities without their own program.
Ready to get to work in West Bloomfield?
Tell us what you need. We’ll help you get it there.


