Cutting control joints: early-entry saw versus conventional saw

The age of the concrete picks the saw. Hours old: early-entry. Cured: walk-behind.

Compare machines

Early-entry concrete saw

Diamond Products CC150XL-EE early-entry saw

Cut it today.

Built to cut control joints within hours of finishing, before the slab cracks on its own.

  • Fresh concrete, same day as the pour
  • About 100 lb; 4.8 hp Honda
  • Shallow, clean joints with little edge damage
See the early-entry saw
18 in walk-behind concrete saw

EDCO 18 in walk-behind saw

Cut it once it has cured.

A 13 hp wet saw for joints and cuts in hardened concrete and asphalt.

  • Cured concrete, days or years old
  • Up to 6.75 in deep; 212 lb
  • Wet cut; bring a hose
See the walk-behind saw

Early-entry saw or conventional saw?

The short version: concrete cracks as it cures, and a control joint is a planned weak line that tells it where. The early-entry saw cuts that line while the slab is still green, within hours of finishing, so the joint is in place before the slab builds enough stress to crack somewhere else. A conventional saw would tear a slab that fresh. The walk-behind saw is the tool once the concrete has hardened: deeper cuts, longer blade life, and the right choice for an old slab that never got joints or a joint you need to deepen. Both make silica dust and both need a respirator.

Cut it today.

Built to cut control joints within hours of finishing, before the slab cracks on its own.

See the early-entry saw

  • Fresh concrete, same day as the pour
  • About 100 lb; 4.8 hp Honda
  • Shallow, clean joints with little edge damage

Cut it once it has cured.

A 13 hp wet saw for joints and cuts in hardened concrete and asphalt.

See the walk-behind saw

  • Cured concrete, days or years old
  • Up to 6.75 in deep; 212 lb
  • Wet cut; bring a hose

What are you trying to do?

Pick your situation to see which saw starts the job.

Pouring a slab today

The early-entry saw, on site before the pour

The window to cut joints in green concrete is short and it opens the same day you finish. If the saw is not on site, the window closes without you.

Book the early-entry saw with the mixer or buggy and have it at the forms when you start finishing. Mark the joint lines on the forms before the pour so you are not measuring on wet concrete. Spacing and depth come from your mix supplier or plan; a common rule puts the depth near a quarter of the slab thickness, but confirm it. Ask staff at pickup how the saw handles dust and what it needs from you.

  • Decorative, stamped or colored surface: ask your finisher before cutting anything. Some finishes get tooled joints instead.
  • A pad small enough to cover with a sheet of plywood: a hand groover at finishing time may be all it needs.
  • Weather turns cold or hot: the window shifts. Cold slows curing; heat speeds it. Watch the slab, not the clock.
  • What joint spacing and depth does your supplier or plan call for?
  • Who is cutting while the rest of the crew is cleaning up?
  • Is the saw booked for pour day, with the return the next morning?
  • diamond-products-cc150xl-ee-first-cut-early-entry-saw-honda
  • cement-track-power-buggy
  • cement-mixer

Poured days ago, no joints yet

The walk-behind saw, as soon as you can

Once the slab has hardened, the early-entry saw's advantage is gone and the conventional saw cuts cleanly. The sooner the joints go in, the better the odds the slab has not already picked its own crack line.

Look the slab over first. If it has already cracked, cut your joints to include those cracks where you can; a crack inside a joint is invisible, a crack beside one is permanent. Cut wet with the hose running and wear a respirator. Depth comes from your supplier or plan. The saw cuts up to 6.75 in, far more than a joint needs, so set the depth and hold it.

  • Slab is still too green to walk on without marking: wait. A conventional blade tears fresh concrete.
  • Cracks have already run everywhere: joints will not undo them. Decide whether you are hiding them in cuts or living with them.
  • Slab is under a building that is going up: cut before the walls and equipment are in the way.
  • How many days since the pour, and has it cracked yet?
  • Where were the joints supposed to be?
  • Is there a hose that reaches the whole slab?
  • cement-asphalt-saw-walk-behind-18in

Pole barn or garage floor

Early-entry saw on pour day, planned with the pour

A large floor has a lot of joint to cut and a short window to cut it in. The early-entry saw is light enough to run across the whole floor the same afternoon, and the joints are in before the slab is loaded.

Lay out the joint grid from your plan before the pour and mark it on the forms or the posts. Cut in the order the slab was finished so you follow the set. If the pour is big enough that a truck and buggy are involved, the saw rides along on the same rental. Our pole barn guide covers the floor stage inside the full build.

  • Floor was poured by a contractor who tooled or cut joints already: check before you rent anything.
  • Floor is cured and has no joints: walk-behind saw, and sooner rather than later.
  • Fiber or steel reinforced slab with its own joint plan: follow the plan; the saw does not change it.
  • Total linear feet of joint on the plan?
  • Who is running the saw while the finishers are still working the far end?
  • Can the saw and the buggy come on one delivery?
  • diamond-products-cc150xl-ee-first-cut-early-entry-saw-honda
  • cement-track-power-buggy
  • cement-asphalt-saw-walk-behind-18in

Asphalt, or an old slab for repair

The walk-behind saw with the right blade

Asphalt and old concrete are cured by definition. The walk-behind saw cuts them at depth, and the blade is chosen for the material. The early-entry saw has no role here.

For a driveway patch, cut a rectangle outside the damage so the new material has a vertical edge to bond to. For deepening an old joint or isolating a section you plan to remove, set the depth and cut wet. Tell the counter whether it is concrete or asphalt; the blades differ and the wrong one cuts badly.

  • Removing the section after cutting: the electric demolition hammer breaks it along the cut.
  • Cuts up against a wall or curb: finish the last inches with the handheld saw.
  • The slab is failing all over: that is a base or drainage problem. Investigate before you cut.
  • Concrete or asphalt, and how thick?
  • How many linear feet of cut?
  • What happens to the cut section afterward?
  • cement-asphalt-saw-walk-behind-18in
  • cement-asphalt-saw-handheld-14in
  • demolition-hammer-70-lbs-electric

Why the timing matters

  • Concrete shrinks as it cures and it cracks to relieve the stress. A control joint is a straight, shallow cut that makes one line weaker than the rest of the slab, so the crack forms there, under the joint, where no one sees it. If the joint goes in after the slab has already cracked, the crack stays where it is and the joint is decoration.
  • The early-entry saw exists because the window is short. It cuts green concrete without tearing the edges, which a conventional blade would do. Once the slab has hardened, the conventional saw takes over and the early-entry saw's job is done. Neither saw decides the spacing or depth; that comes from your mix supplier, your plan or your building department.

What to ask before you cut

  • Ask the mix supplier or your plan for joint spacing, joint depth, and the earliest time to cut for the mix and the weather. Ask whether the slab has reinforcement that affects the pattern. Then mark the layout before the pour. On pour day, watch the slab, not the clock; weather moves the window.
  • Cutting, early or late, makes silica dust. Wear a respirator rated for it. The walk-behind saw cuts wet, so bring a hose that reaches the whole slab. Ask staff at pickup how the early-entry saw handles dust and what you should bring for it.

Your project checklist

Save these details before you request equipment.

  • Pour date, or the date the slab was poured
  • Slab thickness and total area
  • Joint spacing and depth from your supplier or plan
  • Linear feet of joint to cut
  • Hose reach for the walk-behind saw
  • Who runs the saw on pour day

Let's match the machine to your job.

Tell us what you're working on. Our Hamburg team serves Southeast Michigan, seven days a week.

(810) 231-7368

Explore equipment for this guide

Questions before you rent

How soon after the pour do I cut with the early-entry saw?

Within hours of finishing, once the surface can take the saw without marking. The exact point depends on the mix, the temperature and the thickness, so watch the slab rather than the clock. Your mix supplier can tell you what to expect for that day's weather. Book the saw so it is on site when finishing starts, because the window does not wait for a pickup run.

How deep should a control joint be?

Get the depth from your mix supplier, your plan or your building department. A common rule of thumb puts it near one quarter of the slab thickness, but reinforcement, slab use and the mix can change that. The walk-behind saw cuts up to 6.75 in, far deeper than a joint needs, so set the depth and hold it. The early-entry saw cuts shallower by design; ask staff what depth the fleet unit is set up for.

The slab already cracked. Is it too late for joints?

Too late to prevent those cracks. The rest of the slab can still be controlled. Cut joints with the walk-behind saw and route them through the existing cracks where you can, so the crack sits inside the joint. Then cut the rest of the grid at your plan's spacing to catch future movement. A crack beside a joint is permanent; one inside a joint disappears. Cut wet and wear a respirator.

Can I use the early-entry saw on an old slab?

You can, and there is no reason to. The early-entry saw is built for green concrete and gives up depth to get there. On a cured slab the 18 in walk-behind saw cuts deeper, faster and with a blade meant for hard concrete. If you are cutting asphalt, the walk-behind is the only option, with the asphalt blade. Tell the counter the material and the age of the slab and we will send the right saw.

How do these saws get to the site?

The early-entry saw is about 100 lb and the walk-behind is 212 lb. Both ride in a pickup bed with a ramp or two people, or on our 5x10 utility trailer. Delivery is priced by drive time from Hamburg and confirmed at checkout, $85 round trip within 45 minutes for a truck load. If a buggy or mixer is already being delivered for the pour, the saw rides along.