One panel, in six stages
A sidewalk panel is a small slab with neighbors on two sides. The work is the same as a patio removal, scaled down, with more care at the joints.
The saw and hammer are usually a one-day rental. The mixer comes later, once the base is ready. Rent each for the time it is out; the week rate covers 3 to 7 days if the job stretches.
Find out why it failed
Measure the lip at the joint and look at what caused it. A tree root is the common cause of a heaved panel. Settled base, a downspout washing under the slab, or a utility trench that was never compacted cause a sunk panel. If the panel is only lifted an inch or less and is otherwise sound, grinding the lip down with the Crete Planer may be all it needs. If the slab is cracked through, it comes out.
Tape measure and a straightedge. Photos for the counter.
Free the panel at the joints
Sidewalk panels are usually poured in a run, so the joint is a groove, not a full break. Cut it with the 18 in walk-behind saw so the neighboring panels stay whole. The saw cuts up to 6.75 in and runs wet; bring a hose and wear a respirator. If a crack runs into the next panel, decide now whether that one comes out too. Tell staff it is concrete so the right blade is mounted.
18 in walk-behind cement saw. STIHL TS420 handheld where the saw cannot reach a corner by a step or post.
Break it into pieces you can lift
The Hilti TE 3000 electric demolition hammer runs on a standard outlet, no compressor needed. Start at a free edge or a crack and work toward the cut joints. Break pieces to a size two people can lift or one person can get into a wheelbarrow. Keep the area damp to hold down dust. Pry the pieces loose with a bar; the hammer breaks, it does not lift.
Hilti TE 3000 electric demolition hammer; a pry bar and wheelbarrow of your own.
Deal with the root or the base
Cut the offending root back and expect the tree to notice; a large root near the trunk is a question for an arborist. Dig out soft or washed base to firm ground and bring in compactable stone. Compact it in lifts of a few inches with the plate compactor. Redirect the downspout if that was the problem. If the base is being dug out more than a few inches, contact MISS DIG 811 three business days before you dig.
Plate compactor. A shovel and a hand tamper for the corners.
Get the pieces off the lawn
A single 5 ft by 5 ft panel at 4 in thick weighs roughly 1,250 lb, so one or two panels fit on the 5x10 utility trailer at its 2,000 lb limit. More than that, or a long run of panels, means the 7x14 dump trailer, which needs a 2 5/16 in ball and a brake controller. Ask the disposal site whether it takes clean concrete before you load.
5x10 utility trailer for one or two panels; 7x14 dump trailer for a run of them.
Form, pour, finish, joint
Set forms to the height of the neighboring panels and slope them the same way. The towable mixer has a 12 cu ft drum and mixes 1.5 to 2 bags per batch. A 5 by 5 panel at 4 in is about 8.3 cu ft of concrete, which is roughly 14 bags at 80 lb; check the yield printed on your bag. If your plan calls for dowels into the neighboring panels, the TE 70 rotary hammer drills the holes; tell staff the diameter. Tool a joint to match the rest of the walk and rinse the mixer right after the last batch.
Towable cement mixer (2 in ball). Hilti TE 70 rotary hammer for dowel holes.
Check whose sidewalk it is
- A sidewalk along the street is often in the public right of way even though the homeowner maintains it. Many townships and cities have rules about who may replace a panel, what thickness and mix they want, and whether a permit or inspection is required. Call the municipality before you cut anything. A walkway from the driveway to your front door is yours and those rules usually do not apply.
- If the township says a contractor must do the work, you can still rent the saw and hammer for your own private walk. Just do not start on the public panel without asking.
When grinding beats replacing
- A sound panel with a small lip at one joint is often a trip hazard, not a demolition job. The EDCO Crete Planer is a gas-powered scarifier that levels trip hazards and roughens concrete. It is for outdoor use. The result is a tapered, textured ramp over the lip rather than a flush panel.
- Grinding does not fix the cause. If a root lifted the panel, it keeps lifting. Treat grinding as a repair that buys time, and replace the panel when the lip grows back.
Your project checklist
Save these details before you request equipment.
- Number of panels and their size
- Lip height at each joint and the likely cause
- Whether the walk is in the public right of way
- Nearest outlet for the demolition hammer
- Tow vehicle ball size and whether it has a brake controller
- Bags of concrete your panel size works out to
- Where the broken concrete will go
Let's match the machine to your job.
Tell us what you're working on. Our Hamburg team serves Southeast Michigan, seven days a week.
(810) 231-7368
Explore equipment for this guide
Questions before you rent
Do I really need the saw, or can I just break at the joint?
You can try, and the break will often wander into the next panel. A sidewalk joint is a groove a fraction of the slab's depth, so the concrete below it is continuous. A saw cut through most of the thickness gives the break a place to stop. For one panel, the saw is a short rental. Replacing a second panel because the first broke wrong costs more.
Is the electric demolition hammer enough for a sidewalk?
Yes for typical 4 in sidewalk. The TE 3000 is a full-size electric breaker at 858 blows per minute and it is the tool we send for sidewalks, steps and small slabs. It needs a standard outlet and a cord rated for it; Ward's does not rent generators or compressors. If you hit a thick footing under the panel, stop and call. The loader-mounted breaker is the next step up and needs room for a skid steer.
How many bags of concrete does one panel take?
Work it out from the volume. Length times width times thickness in feet gives cubic feet; a 5 by 5 panel at 4 in is about 8.3 cu ft. An 80 lb bag yields roughly 0.6 cu ft, so figure about 14 bags and check the yield printed on your bag. The mixer handles 1.5 to 2 bags per batch, so that is seven or eight batches. For several panels, ready-mix and a power buggy may make more sense.
Which trailer do I need for the debris?
One or two panels, roughly 1,250 lb each at 4 in, fit on the 5x10 utility trailer with its 2,000 lb limit and 2 in ball. A longer run goes in the 7x14 dump trailer, which needs a 2 5/16 in ball, a rated hitch and a brake controller. Delivery of a trailer is priced by drive time from Hamburg and confirmed at checkout, $85 round trip within 45 minutes. Load to the weight, not the wall height.
Do I need to call MISS DIG to replace a sidewalk panel?
If you only lift the panel and pour on the existing base, you are not digging. If you dig out base, chase a root, or trench a downspout line, you are. Michigan law requires contacting MISS DIG 811 at least three business days before digging, and it is free. Sidewalks along the street often sit near shallow utilities, which makes the call more important.
How long before I can walk on the new panel?
Follow your mix supplier's instructions, since cure time depends on the mix, the temperature and the thickness. We do not set a number because it changes with the weather. Keep foot traffic off until the surface will not mark, and keep the slab damp or covered while it cures. Fence off a public walk so passers-by do not step in it.