Equipment comparison

Backfilling after a construction project: choosing the right equipment

Foundation walls, utility trenches, footings and retaining walls each want a different backfill machine. Pick by what you are filling and what the fill has to do afterward.

Backfilling after a construction project — project scene featuring Ward’s rental equipment.

Compare machines

Bobcat E35 mini excavator at work

Mini excavator

Place. Reach. Control.

Best when the fill has to go down beside something you cannot hit.

  • Sets fill beside a wall or pipe from a distance
  • Pulls the spoil pile back into the trench it came from
  • Blade on the E35 pushes and levels fill
Explore excavators
Tracked skid loader with bucket

Skid steer / track loader

Push. Carry. Spread.

Best when the fill is a pile across the site and the hole is open on one side.

  • Moves large volumes from a stockpile fast
  • Pushes fill into an open trench or against a wall
  • Spreads and rough grades what it drops
Explore loaders

Excavator or loader for backfill?

An excavator sits in one place and swings fill into the hole, so it can backfill against a fresh wall or over a pipe without putting its own weight on the edge. A loader drives up to the hole and pushes or dumps, which is fast when the fill is piled nearby and there is firm ground to drive on, and risky when the edge is soft or the wall is new. Compaction is a third machine in both cases.

Place. Reach. Control.

Best when the fill has to go down beside something you cannot hit.

Explore excavators

  • Sets fill beside a wall or pipe from a distance
  • Pulls the spoil pile back into the trench it came from
  • Blade on the E35 pushes and levels fill

Push. Carry. Spread.

Best when the fill is a pile across the site and the hole is open on one side.

Explore loaders

  • Moves large volumes from a stockpile fast
  • Pushes fill into an open trench or against a wall
  • Spreads and rough grades what it drops

What are you backfilling?

Pick the job to see where to start.

New foundation or basement wall

Mini excavator, placing fill in lifts

A new wall is the most expensive thing on the site and the easiest to crack. An excavator places fill against it from a distance, a lift at a time, without the machine's weight on the wall or the edge of the excavation.

The E35 (about 10 ft dig, 3,318 lb rated lift) reaches over the excavation and sets fill where you want it; its blade pushes and levels the pile between swings. The E48 adds reach and lift for a deep basement or a big stockpile, and does not dig meaningfully deeper. The E10 does a crawl space or an addition footing through a gate. Wait for the builder's go-ahead on waterproofing and drain tile cover before any fill goes in, and bring in the stone they call for around the tile.

  • Wall is braced and the fill is a big pile on firm ground: a T66-2 can push the bulk in once the excavator has placed the first lifts against the wall.
  • Deep basement, long wall, truck loads of fill: the E48 covers more from each setup.
  • Any question about when the wall can take load: that is the builder's or engineer's call, not ours.
  • Wall height and the distance from the wall to the far edge of the excavation?
  • Is the stockpile next to the hole or across the site?
  • What does the builder want around the drain tile, and how much?
  • e35
  • e48
  • t66-2

Utility or drain trench

The machine that dug it, then a plate compactor

Trench backfill is the spoil pile going back where it came from. The excavator that dug the trench pulls the pile back in from alongside. A loader pushes it in fast where the trench is open and the ground beside it is firm.

Bed the pipe or conduit by hand with whatever the installer specifies before any machine fills over it, and keep rocks and chunks off the first lift. Then the E10 or E35 pulls spoil back in. Compact in lifts of a few inches with the plate compactor; the plate is 23 by 20 in, so a 6 in trencher slot is too narrow for it. Ward's does not list a rammer for narrow trenches, so plan to fill a narrow slot in thin lifts and settle it with water where the installer allows, or call us to talk through it. Crown the fill a little; it settles.

  • Trench cut with the 6 in trencher: a shovel and the trencher's own spoil do most of it. No machine fits in the slot.
  • Trench under a future driveway or slab: compaction matters more; get the lift spec from whoever is pouring.
  • Someone needs to be in the trench to bed pipe: slope or shore anything a person stands in.
  • Trench width, depth and length?
  • What bedding does the pipe or conduit installer require over it?
  • What goes on top afterward: lawn, drive, slab?
  • e10
  • e35
  • compactor

Deck footings, posts or piers

Usually a loader, often by hand

Footing and post holes are small. The fill around them goes back by shovel or a small bucket, and the question is more about where the leftover spoil goes than how to place it.

For a deck or shed with a dozen holes, the MT100 carries the spoil away and brings stone or soil back through a 36 in gate; the fill itself goes in by hand so you do not shove the post. A pole barn with a long run of holes and a big spoil pile is T66-2 work: push the spoil back around the posts after they are set and braced, then grade the site. Tamp each hole in lifts with a hand tamper or the plate compactor around the post.

  • Posts not yet braced: do not push against them with a machine.
  • Holes drilled in clay with a lot of spoil: a dump trailer to get rid of it may matter more than the backfill machine.
  • Concrete footings being poured: the mixer or a concrete buggy, then backfill after cure.
  • How many holes and how big is the spoil pile?
  • Are the posts set and braced before backfill?
  • Does the spoil leave, or does it spread on site?
  • mt100
  • t66-2
  • compactor

Behind a retaining wall

Excavator for the drainage stone, loader for the bulk

Retaining wall backfill is two materials: drainage stone right behind the wall, then soil behind that, placed in lifts as the wall goes up. The stone has to land in a narrow zone without knocking blocks; soil behind it is bulk work.

The E10 or E35 drops stone precisely behind each course from the uphill side. The MT100 or T66-2 brings soil in and pushes it into the zone behind the stone. Compact each lift with the plate compactor, staying back from the wall face as your wall supplier directs; machine weight right behind a dry-stacked wall pushes it out. Get the drainage stone depth, fabric and lift height from the wall system's instructions or your engineer.

  • Wall under about 3 ft with a 36 in gate: the MT100 and a shovel may be all you need.
  • Wall over about 4 ft or holding a slope with a structure above it: engineered design and a contractor.
  • No place for the wall's drain to exit: solve that before backfilling.
  • Wall height and length, and the wall system's backfill spec?
  • Can a machine work from the uphill side without loading the wall?
  • How many yards of stone and of soil, and where are the piles?
  • e10
  • mt100
  • compactor

Compaction is a separate job

  • Neither an excavator nor a loader compacts fill. Driving over it packs the top few inches and leaves the rest loose; that is why backfilled trenches sink a year later. Place fill in lifts of a few inches and compact each one before the next. The Wacker Neuson plate compactor handles trench and wall backfill where the plate fits. The 36 in ride-on roller is for wide, open fills like a driveway base. Ward's does not list a rammer (jumping jack) for narrow trenches.
  • The lift thickness and the fill material come from whoever is responsible for what goes on top: the builder, the pipe installer, the wall system's instructions or the building department. We supply the machine, not the spec.

When to call before you rent

  • A foundation wall that has not been cleared for backfill by the builder, a retaining wall over about 4 ft or holding anything structural, a trench anyone has to enter, or fill going in over a septic system: each of those has a professional whose call comes first. Trench walls can collapse; slope or shore anything a person stands in. If the excavation is bigger than a mini excavator handles, tell us the dimensions and we will say so rather than stretch a machine.

Before choosing a machine, check the site

Measure the narrowest opening

Gate fully open, latch included, and the turn into it. The bucket is machine width on the MT100; the E10 extends to 43 in to work.

Check the ground beside the hole

A loader needs firm ground at the edge. Fresh spoil and rain-soaked clay are not firm. An excavator works from farther back.

Know the fill

Yards of soil and of stone, where the piles are, and the lift and material spec from the builder or installer.

Machine widths, from our product pages

Width is the machine body. Measure the clear opening and the route, and account for the attachment.

Bobcat E10 mini excavator — 28 in retracted / 43 in extended

Bobcat MT100 stand-on loader — 35.6 in

Bobcat T66-2 track loader — 67 in

Kubota SVL65-2 track loader — 68 in

Bobcat E35 mini excavator — 69.7 in

Bobcat E48 mini excavator — 72.8 in

Trench safety: — trench walls can collapse. Slope or shore anything a person stands in, and keep spoil and machines back from the edge.

Your project checklist

Save these details before you request equipment.

  • What is being backfilled and its dimensions
  • Builder or installer sign-off that it is ready for fill
  • Fill material and lift spec from the responsible party
  • Yards of soil and stone, and where the piles are
  • Ground conditions at the edge of the excavation
  • Narrowest opening on the route
  • Delivery location and preferred dates

Let's match the machine to your job.

Tell us what you're working on. Our Hamburg team serves Southeast Michigan, seven days a week.

(810) 231-7368

Explore equipment for this guide

Questions before you rent

Can I backfill with the same machine I dug with?

Usually yes, and it is the simplest plan. The excavator that dug the trench or footing pulls its own spoil pile back in from where it sits. If you rented the excavator for the dig and returned it, a loader can push the pile back in when the hole is open on one side and the ground beside it is firm. Where fill has to be placed carefully, against a new wall or over a pipe, an excavator's reach is worth having back on site. The week rate covers 3 to 7 days, which often spans dig, inspection and backfill.

Does the E48 backfill better than the E35?

It reaches farther and lifts more: 207 in of reach and a 4,921 lb rated lift against the E35's 204 in and 3,318 lb. That means more of the hole covered from one spot and a heavier bucket of wet fill per swing. Its dig depth is nearly the same as the E35's, so do not rent it to go deeper. The E48 is close to 10,000 lb and most customers take delivery; the E35 tows behind a 3/4-ton truck on our 16 ft trailer. For most residential backfill, the E35.

How do I compact the backfill?

In lifts of a few inches, with the plate compactor, where the plate fits. The Wacker Neuson plate is 23 by 20 in and delivers 3,375 lb of force, so it works in a trench wider than about 2 ft and anywhere open. The 36 in ride-on roller is for wide fills like a driveway base. For a 6 in trencher slot nothing in our fleet fits; Ward's does not list a rammer. Thin lifts, a hand tamper and settling with water where the installer allows are the usual answer, and we are happy to talk it through.

What if I need fill or stone brought in?

Order it from a supplier and have it dropped as close to the hole as the truck can get, then move it with the loader or the excavator. If you are hauling it yourself, the 7x14 dump trailer holds 10.9 cu yd and is rated 14,000 lb GVWR; it takes a 2 5/16 in ball and a brake controller, and wet material hits the weight limit well before the trailer is full. Delivery of our equipment runs seven days a week, priced by drive time from Hamburg: $85 round trip within 45 minutes for a single machine, $125 for a dual-machine load, confirmed at checkout.

When can I backfill a new foundation?

Ask the builder or the engineer, and the building department if an inspection is required before fill goes in. Concrete cure, waterproofing, drain tile cover and whether the wall is braced all come into it, and none of them is a rental question. What we can tell you is that an excavator placing fill in lifts from a distance is the gentlest way to do it once you have the go-ahead, and that driving a loaded machine along the edge of a fresh excavation is the thing to avoid.