Equipment comparison

Skid steer or mini excavator?

See what each machine does. Choose a starting point for your project.

Bobcat T66-2 moving gravel and Bobcat E35 excavating on a residential project.

Compare machines

Bobcat T66-2 spreading topsoil to level a residential yard.

Skid steer / track loader

Move. Spread. Grade.

Best starting point for moving piles and shaping surfaces.

  • Move gravel, soil and mulch
  • Spread and level material
  • Use forks, augers or grapples
Explore loaders
Bobcat E35 mini excavator lifting a boulder on a rocky site

Mini excavator

Dig. Reach. Load.

Best starting point for digging below ground and placing spoil.

  • Excavate trenches and holes
  • Reach into confined work areas
  • Dig and load spoil
Explore excavators

Skid steer or mini excavator?

The short version: an excavator digs down and swings; a loader drives forward and carries. An excavator removes a bucket of soil from below grade and places it beside the hole or in a trailer without moving its tracks. A loader takes a few inches per pass and moves large volumes across the site fast. Each machine does the other's job slowly and badly.

Move. Spread. Grade.

Best starting point for moving piles and shaping surfaces.

Explore loaders

  • Move gravel, soil and mulch
  • Spread and level material
  • Use forks, augers or grapples

Dig. Reach. Load.

Best starting point for digging below ground and placing spoil.

Explore excavators

  • Excavate trenches and holes
  • Reach into confined work areas
  • Dig and load spoil

What are you trying to do?

Choose your main task to see where to start.

Move gravel or mulch

A loader with a bucket

Good for repeated trips between a material pile and the work area. A loader scoops, carries and dumps in one motion, then spreads what it dropped.

The Bobcat MT100 stand-on loader is 35.6 in wide for gated yards and lighter loads (1,000 lb rated capacity). The full-size Bobcat T66-2 or Kubota SVL65-2 carries more than twice that per trip when the route allows it. For a wheelbarrow-scale path, a slope, or no loader experience, the Canycom tracked buggy (35 in wide, 2,200 lb payload) carries material without a bucket to operate.

  • Narrow opening: measure it before choosing (see Plan access). The bucket is machine width on the MT100; other attachments can be wider.
  • Soft or wet lawn: tracked machines spread weight better than wheels, but tracks don't prevent all rutting and don't make saturated ground workable. After a hard rain, give it a day.
  • Pavement or gravel lot only: the wheeled Bobcat S570 is quicker on hard surfaces and costs less; it ruts turf.
  • Long carry on a slope: a full-size loader is steadier with a heavy bucket than a small one at the edge of its capacity.
  • How many yards of material, and how far is the pile from where it goes?
  • What is the narrowest point on the route, including gates and between buildings?
  • Will the machine cross a septic field, irrigation lines or a lawn you want to keep?
  • mt100
  • t66-2
  • canycom

Dig a trench

Trencher or mini excavator: it depends on the trench

A trencher cuts a narrow, consistent slot and leaves the spoil beside it. A mini excavator digs a wider trench, handles rocks and roots, and places spoil where you want it. Neither is always right.

Ward's tracked trencher cuts a 6 in wide trench up to 36 in deep and is 35.8 in wide, so it suits a straight run of conduit, irrigation line, drain tile or dog fence through a gate, in soil without large rock. Anything that must reach frost depth (about 42 in in most of southeast Michigan, so a potable water line), footings, a trench wider than 6 in, or ground with roots and rock starts with a mini excavator: the E10 for doorway access and digs to about 6 ft, the E35 for most jobs (124 in), the E48 when you need more reach and lift, not more depth.

  • Width: if the pipe plus bedding needs more than 6 in, the trencher is out.
  • Depth: the trencher stops at 36 in. Deeper trenches have entry and protection rules; slope or shore anything a person stands in.
  • Obstacles: roots, buried concrete or fieldstone stall a trencher but are routine for an excavator bucket.
  • Access: the trencher and the E10 both pass openings the E35 cannot.
  • How wide and how deep does the trench need to be, end to end?
  • What is going in it, and does it need bedding material?
  • Have you requested utility locating? Michigan requires contacting MISS DIG 811 before you dig.
  • trencher
  • e10
  • e35

Grade a driveway

A loader, usually with more than a bucket

Grading is a surface job: cut the high spots, fill the low ones, crown the center so water runs off. A loader does this across the whole width of a drive in passes. An excavator can only pull material toward itself.

A full-size tracked loader (Bobcat T66-2 or Kubota SVL65-2) with a bucket handles cutting and back-dragging. For a gravel drive that has washboarded or lost its crown, the 72 in soil conditioner on the T66-2 (it does not fit the Kubota) reshapes and re-levels the existing stone before you add new material. Compaction after grading is a separate step: the 36 in ride-on roller for a full drive, the plate compactor for patches.

  • Potholes keep returning: that is a drainage or base problem, not a grading problem. Investigate where water sits before you prescribe new stone.
  • Washouts along the edge: fix the ditch or culvert first.
  • Fresh stone being delivered: have the loader on site when the truck arrives so you spread it the same day.
  • How long and wide is the drive, and is the base gravel or just topsoil?
  • Where does water go when it rains, and where does it stand?
  • Do you need new material, or is there enough existing stone to reshape?
  • t66-2
  • svl65-2
  • roller

Prepare a patio

A phased plan, not one machine

A paver patio has four equipment stages: remove what is there, excavate to depth, bring in and spread base, and compact it. Small patios with easy access can do all of it with one loader. Larger or deeper footprints go faster with an excavator for the dig and a loader for the carry.

Stage 1, removal: the gas sod cutter for lawn (18 in, up to 2.5 in deep), or the electric demolition hammer for an old slab. Stage 2, excavation: the E10 or E35 for a deeper dig or a tight footprint against the house; an MT100 or T66-2 bucket for a shallow dig over open ground. Stage 3, material: the loader carries base stone from the driveway pile to the footprint; the tracked buggy does it through a 36 in gate without a loader. Stage 4, compaction: plate compactor in lifts. The paver saw comes last. The typical weekend package in our patio guide is sod cutter, MT100, plate compactor and paver saw.

  • Easy access and a shallow dig: skip the excavator and run the whole job on one loader.
  • Footprint against a foundation or under low branches: the excavator's reach lets you dig without driving onto the finished edge.
  • A full patio guide with stage-by-stage detail already exists; this chooser only gets you started.
  • Square footage and excavation depth from your paver supplier's base spec?
  • Where will excavated soil go, and where will base stone be dropped?
  • Can a trailer or truck get to the drop point, or does every yard of material move through a gate?
  • sod-cutter
  • mt100
  • compactor
  • paver-saw

Drill post holes

An auger: handheld or on a loader

Neither machine's bucket is the tool here. The question is which auger drive matches your hole count, soil and access. Your fence or deck plans set the hole diameter and depth; the equipment just has to reach them.

A handful of holes in workable soil with tight access: the Little Beaver gas handheld auger (6, 8 or 10 in bits; its engine sits apart from the drill head so it doesn't twist your arms). A full fence line, clay, rock, or holes deeper than a handheld unit reaches: a hydraulic auger on the MT100 (fits a 36 in gate) or on the T66-2 or S570 (more torque; bits to 36 in; 72 in depth without an extension). The first bit is included with every auger; extra bits are added at booking.

  • Rocky or root-filled ground: a machine-mounted auger finishes holes a handheld unit will fight.
  • Holes along a property line: confirm the line first. Finding an old pin with a metal detector helps you look, but it does not establish the legal boundary.
  • Old concrete footings in the way: that becomes an excavation job, not a drilling job.
  • How many holes, what diameter and depth does your plan call for?
  • What is the soil like at depth: sand, clay, rock?
  • Have you called MISS DIG 811? Post holes count as excavation.
  • mt100-auger
  • little-beaver
  • t66-2-auger

Remove a stump

Grind it, or dig the whole root ball

Grinding chews the stump into chips below grade and leaves the roots to rot, so you can seed or sod over it. Excavating pulls the entire root ball out, which is what you need if something is being built or planted in that exact spot.

For a stump you just want gone from the lawn, the Vermeer SC30TX tracked stump grinder is 35 in wide, passes a 36 in gate, works on slopes and soft ground, and leaves the lawn around the stump mostly intact. For a stump where a footing, patio or drain line is going, the Bobcat E35 lifts the root ball out; the E48 adds reach and lift for large hardwoods, and the E10 handles small stumps with tight access. Either way, plan for the hole and the debris: a stump grinder leaves chips and a depression to backfill; an excavated root ball fills a dump trailer fast.

  • Stump next to a foundation, septic tank, gas line or sidewalk: grind, don't pull. Excavating near buried services is a job for a professional with locates in hand.
  • Standing tree or hanging limbs: not a rental job. Have a tree service bring it down first.
  • Dozens of small stumps after clearing: the root grapple on the loader handles the pile once the excavator has them out, and the 12 in chipper handles the tops.
  • Stump diameter at ground level, and how many?
  • What is going in that spot afterward: lawn, a structure, a planting bed?
  • What is within 10 feet: utilities, septic, foundations, fences?
  • stump-grinder
  • e35
  • grapple-66

Some projects need both machines.

A patio project can involve digging, moving material and preparing the base.

Both machines on one delivery truck is routine for us; a dual-machine load is priced at its own delivery tier and confirmed at checkout. Renting both for the days you need them usually costs less than forcing one machine to do a job it isn't built for.

Dig out the footprint

A mini excavator handles the digging and sets spoil aside or straight into a trailer.

Move spoil and bring in base

A loader carries material across the site and spreads it in lifts.

Compact in stages

Match the compactor and method to the base material and your supplier's spec.

See the full paver patio guide

Before choosing a size, check the site.

Measure the narrowest opening

Include latches, posts, turns and the attachment width. A bucket or auger is often wider than the machine.

Check the travel route

Consider slopes, soft ground, septic fields, irrigation heads and buried structures between the drop point and the work.

Know the job dimensions

Bring digging depth, material quantities and the height you need to load into or reach over.

Machine widths, from our product pages

Width is the machine body. Add the attachment and a few inches each side before you call it a fit: the 66 in grapple on a 67 in loader, or the 56.75 in soil conditioner on a 35.6 in MT100, decide the answer, not the machine. If you're a few inches short, pulling one fence panel is often easier than running the whole job on a smaller machine.

Bobcat E10 mini excavator — 28 in retracted / 43 in extended

Vermeer SC30TX stump grinder — 35 in

Canycom tracked buggy — 35 in

Bobcat MT100 stand-on loader — 35.6 in

Trencher 6 in x 36 in — 35.8 in

Bobcat T66-2 track loader — 67 in

Kubota SVL65-2 track loader — 68 in

Bobcat E35 mini excavator — 69.7 in

Bobcat E48 mini excavator — 72.8 in

Before ground disturbance: — arrange utility locating through MISS DIG 811, including private lines where needed. Review site hazards with our team.

Your project checklist

Save these details before you request equipment.

  • Main task and approximate project size
  • Narrowest access point and turning space
  • Ground conditions and slopes
  • Required attachments
  • Delivery location and preferred dates

Let's match the machine to your job.

Tell us what you're working on. Our Hamburg team serves Southeast Michigan, seven days a week.

(810) 231-7368

Explore equipment for this guide

Questions before you rent

Will the machine fit through my gate?

Measure the clear opening with the gate fully open, including the latch hardware. The MT100 body is 35.6 in wide and the E10's undercarriage retracts to 28 in, so either can pass a 36 in opening when the attachment and the route allow it. Full-size loaders and the E35 need a clear 6 ft; the E48 needs more. Width is only half the question: also check the turn into the opening and what the tracks will cross on the way in. Our backyard access guide walks through it.

Which attachments do I need?

A standard bucket comes with every loader and excavator rental. Add forks for pallets, an auger for post holes, a root grapple for brush and debris, or a soil conditioner for seedbed and driveway reshaping. Attachments rented with the machine are half price. Tell us the task and we'll confirm the attachment is compatible with the machine you're booking.

Should I arrange delivery or tow it myself?

Mini excavators and full-size loaders ride on our 16 ft equipment trailer with a 2 5/16 in ball and need a 3/4-ton truck or larger; the MT100 rides on the 12 ft ramp trailer with a 2 in ball, which a half-ton pickup typically handles. The E48 is close to 10,000 lb, so most customers take delivery. Your tow rating has to cover trailer plus machine plus attachments, and we confirm the setup at the counter. Delivery runs 7 days a week on our own trucks, priced by drive time from Hamburg: $85 round trip within 45 minutes, $125 at 46 to 75 minutes, and a quote beyond that. The fee is confirmed at checkout.

How is rental time charged?

You pay for the time the machine is out, including weekends and holidays, not the hours on the meter, and there is no daily or weekly hour cap. Rental periods run 1 to 4 hours, 4.5 to 24 hours, one week (which covers 3 to 7 days) and four weeks. Keep it longer than planned and the extra time is prorated, never more than the next full period. Fuel is billed at our cost with no markup.

Do I need to call MISS DIG?

Yes. Michigan law requires contacting MISS DIG 811 at least three business days before digging, trenching, augering or grinding below grade, and the service is free. Private lines (irrigation, invisible fence, landscape lighting, a line from the house to a shed or pole barn) are not marked by MISS DIG; use your own records or a private locator. A rental metal detector helps you look for pins and buried metal but does not replace the locate.

Which bucket should I pick on the excavator?

Narrow buckets dig cleaner trenches; wide buckets move more dirt and clean up faster. The first bucket is included (E10: 8 or 15 in; E35: 12 or 24 in toothed; E48: 24 in toothed). Additional buckets, including smooth grading buckets, add $30 for a day, $90 for a week or $270 for four weeks. Tell us what is going in the trench and we'll match the bucket to it.