How to Build a Paver Patio Base That Won’t Sink

When a paver patio sinks, heaves or grows ruts after a couple of winters, the pavers are almost never the problem. The base is. Getting the excavation, base stone and compaction right is most of the job, and it’s the part you can’t fix later without pulling everything up.

How Deep to Dig

For a walking patio, plan on about 4 to 6 inches of compacted base stone, an inch of sand or fine bedding, plus the thickness of the paver. That usually means digging 7 to 9 inches below the finished height. Go deeper where you have soft clay, poor drainage, or anywhere a vehicle might drive.

Dig out a little past the edges of the patio, about 6 inches all around, so the base supports the edge restraint and the outer row of pavers.

Slope It Away From the House

Build in a slope of about 1/8 to 1/4 inch per foot away from the house so water runs off instead of pooling. Set the slope in the dirt when you dig, then follow it with the base. Don’t try to make it up in the sand layer.

Compact in Layers

This is where most DIY patios go wrong. Compact the soil at the bottom of the hole first. Then add base stone 2 to 3 inches at a time, dampen it, and run a plate compactor over each layer before adding the next. Dumping all 6 inches and compacting once leaves the bottom loose, and that’s what sinks later.

The Equipment That Saves the Most Time

  • Digging: a mini excavator or the MT100 stand-on loader takes the sod and dirt out in hours instead of days. The MT100 fits through backyard gates.
  • Moving stone: the same loader moves base stone from the driveway to the patio. A dump trailer hauls the dirt away.
  • Compacting: the Wacker Neuson plate compactor handles base stone and sets the pavers at the end.
  • Cutting: a brick and paver saw makes clean cuts on the edges and around steps.

Finishing

Screed the bedding sand flat, lay the pavers, install the edge restraint, sweep in joint sand, and run the compactor over the top (with a pad if your pavers call for it) to lock everything in. Sweep in more joint sand and you’re done.

Call MISS DIG (811) before you dig, especially near the house where gas and electric lines come in. Questions on what to rent? Call us at (810) 231-7368.