A pole barn goes up fast once the posts are in, but the site work decides how it holds up for the next 30 years. A flat, well-drained pad and post holes below the frost line prevent most of the problems people run into later.
Permits and Utilities First
Most townships in Livingston County and the surrounding area need a permit for an accessory building, and they’ll have setback and size rules. Get that sorted before you rent anything. Then call MISS DIG (811) at least three business days before you dig so buried lines get marked.
Clearing the Site
Take out brush, small trees and stumps first. A brush chipper and stump grinder clear a wooded spot quickly. A tracked skid steer with a root grapple handles the debris.
Grading the Pad
Strip the topsoil and organic material from the footprint plus a few feet around it, since topsoil settles and holds water. Then build the pad up with compacted fill and stone so it sits a little higher than the ground around it, and grade the area so water runs away from the building on all sides.
A tracked skid steer like the Bobcat T66-2 or Kubota SVL65-2 is the right machine here. Tracks float on soft ground and handle the cutting, filling and fine grading. Compact the stone with a ride-on roller or plate compactor before you lay out the posts.
Post Holes
Pole barn posts need to go below the frost line, which is about 42 inches in most of Southeast Michigan, and many builders go 4 ft or deeper. Follow your building plans and permit for depth and hole size. A skid steer with a hydraulic auger drills these holes in a fraction of the time of a hand auger, and keeps them plumb.
Lay the building out with batter boards and string, check that the diagonals match so it’s square, and mark every post location before you drill.
Setting Posts and Lifting Trusses
Once the posts are set and braced, a telehandler is the safest way to get trusses and roof steel up. The SkyTrak 6042 reaches 42 ft and lifts 6,000 lb, which covers most residential pole barns. For heavy truss packages, use the 8042 or 10042. Add a truss boom attachment to set trusses one at a time. Telehandlers are delivery-only for almost every customer, and we drop them at your site.
Equipment Checklist
- Tracked skid steer with bucket, root grapple and auger
- Chipper and stump grinder if the site is wooded
- Plate compactor or ride-on roller for the pad
- Telehandler with truss boom for the roof
- Dump trailer for hauling spoils
Call us at (810) 231-7368 and we’ll help you plan the rental around your build schedule. Weekly and 4-week rates usually make the most sense for a pole barn.
